Prepare The Opening; An Accessory Storage Drawer - GE Advantium Serie Instrucciones De Instalación

Ocultar thumbs Ver también para Advantium Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Preparation

PREPARE THE OPENING

The Advantium 120V can be installed in
combination with other GE/Monogram appliances.
Always follow each product's Installation
Instructions to complete the installation.
Single Advantium 120V Installation:
Order a 30 wide single oven cabinet or cut the
opening in a wall to the dimensions shown.
30
17-1/2
case trim overlap on the sides,
1-1/16 overlap on the top and 7/8 overlap
on the bottom of the opening for all models.
of the opening.
When installed over a single oven or a warming
drawer, allow at least 2 between the two
openings. This separation will provide clearance
for bottom overlap of the Advantium 120V and the
other appliance overlaps.
Construct a solid oven floor of 3/8 min. thick plywood
supported by 2 x 4 or 2 x 2 runners on all sides.
flush with the bottom edge of the cutout.
Installation Preparation
WITHOUT
23-1/2
25-1/4
Construct
Base
Min. 3/8
Plywood
Supported
by 2 x 4 or
2 x 2 Runners
all Four Sides

an Accessory Storage Drawer

PREPARE THE OPENING (cont.)
Installation over a GE/Monogram
Warming Drawer:
30
17-1/2
NOTE: Additional clearances between the cutouts
may be required. Check to be sure the oven supports
above the Warming Drawer location do not obstruct
the required interior depth and height. See Warming
Drawer installation instructions for details.
6
23-1/2
Construct
Solid Bottom
Min. 3/8
Plywood
Supported
25-1/4
by 2 x 4 or 2 x
2 Runners all
Four Sides
2 Min.
(3 Recommended)
Per Warming
Drawer
Requirement

Publicidad

Tabla de contenido
loading

Tabla de contenido