MoJack EZ Max Instrucciones Para El Montaje Y La Operación página 5

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Assembly Instructions
STEP 4
Assemble Base with Wheels
to the
4
Base Floor Tube
by inserting the two
3
Flange Bolts
, Washers
and
10
14
Nylon Lock Nuts
and tighten with
13
15mm wrenches.
Nylon Lock Nuts 13
Base Floor Tube 3
STEP 5
Insert the Tower Assembly
1
to the
Base with Wheels
and affix with
4
Clevis Pin
and Hair Pin
as shown.
17
18
STEP 6
Push in side of handle and
rotate from storage position
to the operating position.
Allow to seat into the locked
position.
MoJack EZ Max Lift
4
Base with Wheels
Washer 14
10
Flange Bolts
1
Tower
4
Base with Wheels
18
Hair Pin
17
Clevis Pin
Locked Position
8
Assembly Instructions
STEP 7
Insert the Lift Arm
into the Carrier
2
and insert the Clevis Pin
through the
17
hole in Carrier and lock by fastening the
Hair Pin
to the Clevis Pin.
18
STEP 8
Slide the Wheel Pad Lift Arms
6
onto both sides of the Lift Arm
and
2
secure with Push Pins
.
16
NOTE: The Wheel Pads can be moved
in or out to fit different mower widths.
Use the configuration that works best
with your model of lawn mower.
NOTE: The Safety Straps must
be used during operation
(see Step 9 of the Operating
6
Wheel Pad Lift Arm
Instructions).
WARNING: Wheel pads must be equal distance from the Lift Arm to maintain proper balance.
For additional information, see see Step 6 of the Operating Instructions.
THIS COMPLETES ASSEMBLY.
MoJack EZ Max Lift
Hair Pin 18
17
Lift Arm 2
Lift Arm 2
16
Push Pin
Push Pin 16
Wheel Pad Lift Arm 6
9
Carrier
Clevis Pin

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

45001

Tabla de contenido