Shut-Down Procedure Switch Off - Kärcher HKF 201 E Manual De Instrucciones De Funcionamiento

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 102
HKF 201 E
3. Shut-down procedure-switch OFF
i
Important!
Before starting the shut-down procedure rinse
through the internal cleaner for 30 seconds wit-
hout adding cleaning agents. This way you pre-
vent incrustations and conglutination, and
therefore premature wear of the seals.
n Switch off the separate high-pressure pump,
n Shut off the cleaning liquid supply,
n Switch off the drive unit of the internal clea-
ner by
– removing the mains plug of the electrical
drive units or by switching off the power
supply,
n Remove the internal cleaner from the contai-
ner.
5.961-580
D. Operation
English
D2

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

3.631-061

Tabla de contenido