Connecting; Function Control Cib - BRÖTJE CIB C Montaje / Ajuste

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 45
4.2

Connecting

4.3

Function control CIB

Table 1: LED-status indication
Priority
Status
CIB not configured
1
CIB and BMU incompatible
2
3
CIB configured, LPB-short-
circuit or no feed
LPB-address inadmissible or
4
no feed
5
CIB configured,
LPB-bus signal OK
= LED "OFF";
= LED "ON"
1) See fault code table of the respective gas fuel value boiler
Information: In case of problems, the bus feed should be measured (in case of correct operation>>: 15.5 V DC ± 1.5 V)
Bus module CIB C
Assemble cable screw connectors.
• Feed cable screw connector into the respective hole in the bot-
tom of the boiler and fasten with lock nut (next to the already
assembled screw connections).
• So that the zone controllers or EUROCONTROL can communicate
with the boilers, a 2-pole cable (by the customer) has to be in-
stalled from the bus module CIB to the controllers.
The bus module has a light-emitting diode (LED) to check the com-
munication between the boiler and bus module CIB-EUROCONT-
ROL. This LED indicates the condition of the LPB-bus signal and
signals possible faulty operation (tab. 1).
CIB-bus feed
any
any
any
any
factory setting
ON
LED-status indica-
Communication
tion of the bus
module
disturbed
flickers:
fault code 148
disturbed;
fault code 81
flickers:
check hydr. system
fault code 140
flashes:
in order
in order
Assembly
GB
1)
1)
1)
21

Publicidad

Tabla de contenido
loading

Productos relacionados para BRÖTJE CIB C

Tabla de contenido