5.4
Wiring Diagram
Fig. 5: Wiring Diagram
5.5
Commissioning
Bus module CIB C
International protection IPx4D
The screwed cable connections have to be tightened in order to
meet international protection IPx4D and the specified air-tight
sealing of the air chamber, so that the seal rings seal the cables.
The operation instruction have to be observed, when commissio-
ning the boiler!
Installation
GB
23