Chapin 82108N Manual De Instrucciones página 7

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Step7:
A portion of the Handle will be preassembled as shown.
Carefully remove the (2) M6 Hex Nuts, while holding the rest
of the Handle Assembly together.
Install opposite Handle onto the
exposed (2) M6 Hex Bolts, and
re-secure the (2) M6 Hex Nuts.
Step 8:
Assemble Handle Tube to Frame Legs by sliding Handle Tube into the gap between the two parts and using
(2) M6X55mm bolts and (2) M6 Nylon Locknuts to connect the parts together. Handle orientation is
important (see image). Finish tightening frame legs to the frame body.
CHAPIN INTERNATIONAL, INC. P.O. BOX 549 700 ELLICOTT ST. BATAVIA, NY 14021-0549 www.chapinmfg.com 800-950-4458
Re-assembled
Remove nut from screw on slide
gate, pull screw from gate, place
end of gate control rod into
yolk, insert screw through yolk
& gate control rod, re-assemble
nut onto screw.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

82088n

Tabla de contenido