Installation; Machine Placement; Electrical Connections; Operational Check - Omcan PE-CN-0015 Manual De Instrucciones

Pelador de patatas
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

MACHINE PLACEMENT

When choosing the plane the machine will be placed on the dimensions
shown (based on model), therefore the surfaces must be wide enough to
hold it, and it must be well-levelled and dry. Prearrange a discharge tube
(φ60mm.) under the machine and a drain trap on the floor, or a floor grate
to collect the water or other waste material. Furthermore the machine must
be placed as near as possible to a faucet (φ12mm.), which enables the
feeding tube to be easily and safely attached. Once the machine is placed
proceed to blocking it by fastening it to the floor with the set screws on the
flanged feet. Furthermore the machine must be placed in an environment
with a maximum humidity of 75%, which is not salty and has a temperature
between +5°C and +25°C; in any case in environments which do not bring
about its malfunctioning.

ELECTRICAL CONNECTIONS

The machine is outfitted with a feeding cable with a cross section area of 3
x 1.5mm
/0.06"
, length 1.5m/4.9 ft. Connect the machine to 230V / 50Hz.
2
2
Furthermore check that the data shown on the serial number/technical plate
corresponds to the data on the delivery notes.
Before finally connecting the machine to the three phase feeder line, check the direction of rotation of the cap
by pressing the START push button then immediately stop it by pressing the STOP push button. The direction
of rotation of the cap seen from the discharge outlet must be counterclockwise; if the direction of rotation is not
exact, invert two of the three feeding wires in the plug or outlet.

OPERATIONAL CHECK

Before proceeding to testing make sure the upper cover and the discharge door are well-blocked, then check
the running of the machine with the following procedure:
1. Check that the upper cover and the discharge door are closed well.
2. Press the START push button and then the STOP one.
3. Repeat the same operation, checking that the cap rotates in a counter clockwise direction through the
closed transparent upper cover.
4. Check if the machine stops when running by opening the cover or discharge door, and once it is closed if
the machine restarts by pushing the START push button.
5. To discharge the material open the discharge door, keeping it open with your right hand and at the same
time pushing the OUT and START buttons on the push button strip with your left hand; the machine will
start by unloading the potatoes by centrifugal force.
load φ 12mm
faucet
discharge
7

Installation

Operation

Publicidad

Tabla de contenido
loading

Tabla de contenido