Operation; Loading Fasteners - Grip Rite GRTFR83 Manual Del Operador Y Lista De Piezas

Ocultar thumbs Ver también para GRTFR83:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

OPERATION

LOADING FASTENERS

LOADING NAILS
A fastener can be driven unintentionally if the trigger and safety bracket
are activated at the same time. Always disconnect tool from air supply
before loading fasteners, making adjustments, or performing any ser-
vice on tool. Keep finger off trigger until ready to drive a fastener.
1. Hold tool handgrip securely
TOP LOADING
2a. Insert nail strip into TOP of
magazine, with nail points
angled forward and down.
Slide nail strip forward.
REAR LOADING
2B. Insert nail strip into REAR of
magazine, with nail points
angled forward and down.
Slide nail strip forward.
3. Pull pusher (A) back to rear
of magazine, behind last nail
strip.
4. Slide pusher forward to
engage last nail strip, and
release.
5. Tool is now loaded and ready
for normal operation.
UNLOADING NAILS
1. Pull pusher back, fully depress
pusher lever (B), then slide
pusher all the way forward to
front of magazine.
2. Release pusher lever (B).
3. Slide nail strips back to rear of
magazine, depress the stop-
per, and remove the nails from
rear loading slot.
DANGER
10
B
A
C

Publicidad

Tabla de contenido
loading

Productos relacionados para Grip Rite GRTFR83

Este manual también es adecuado para:

Grtfr83l

Tabla de contenido