Installation Preparation; Hanging Bracket Installation - Craftmade Ellington E-BFT52ABZ5C Guia De Instalacion

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

3. Installation Preparation.

To prevent personal injury and damage, ensure
that the hanging location allows the blades a
clearance of 7ft. (2,13m) from the floor and 30in.
(76cm) from any wall or obstruction.
This fan is suitable for room sizes up to 400
square feet (37.2 square meters).
This fan can be mounted with a downrod
on a regular (no-slope) or vaulted ceiling. The
hanging length can be extended by
purchasing a longer downrod (0.5in./1.27cm
diameter). After installing hanging bracket,
continue to Section 5 on page 4 for those
instructions. This fan can also be mounted as a
flushmount only on a regular (no-slope)
ceiling. After installing hanging bracket,
continue to Section 6 on page 5 for those
instructions.
Installation requires the following tools:
Phillips screwdriver, flat-head screwdriver,
adjustable pliers or wrench, stepladder, wire
cutters, and rated electrical tape.

4. Hanging Bracket Installation.

Turn off circuit breakers to current fixture from breaker panel
and be sure operating light switch is turned to the OFF position.
WARNING: Failure to disconnect power supply prior to installation
may result in serious injury.
Remove existing fixture.
WARNING: When using an existing outlet box, be sure the outlet
box is securely attached to the building structure and can support
the full weight of the fan. Ensure outlet box is clearly marked
"Suitable for Fan Support." If not, it must be replaced with an
approved outlet box. Failure to do so can result in serious injury.
CAUTION: Be sure outlet box is grounded properly and that a
ground wire (GREEN or bare) is present.
Partially loosen screws in slotted holes of canopy. Remove the
other 2 screws and star washers--save for later use. Twist canopy
to remove hanging bracket.
Install hanging bracket to outlet box using original screws,
spring washers and flat washers provided with new or original
outlet box.* Install rubber cushions (if not already pre-attached
to hanging bracket) between outlet box and hanging bracket to
reduce vibration of metal to metal surfaces. If installing on a
vaulted ceiling, face opening of hanging bracket towards high
point of ceiling. Arrange electrical wiring around the back of the
hanging bracket and away from the hanging bracket opening.
*Note: It is very important that you use the proper hardware when
installing the hanging bracket as this will support the fan.
blade edge
30
inches
7 feet
(2.13m) (76cm)
downrod
installation
rubber cushions
hanging bracket
page 3
12ft. - 20ft.
(3.66m - 6.1m)
flushmount
installation
Vaulted ceiling
angle is not to
exceed 25 degrees.
flat washers
outlet
box screws
spring
washers

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Ellington e-bft52an5c

Tabla de contenido