Door Closing Pressure; Mounting The Tray; Chimney Maintenance And Sweeping - FRANCO BELGE SAVOY 134 08 02 Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Poêle à bois
Figure 5 - Mounting the tray
1
Figure 6 - Door closing pressure

2.5. Door closing pressure

Figure 6
The closing latch rotates around a pressure screw
positioned cam.
- Remove gently the ceramics rope
- Loosen pressure screw 1.
- Turn cam 2 to desired position.
- Tighten pressure screw 1.
Figure 7 - Removing the fuel retainer
18
"SAVOY"
A
2
Document n° 955-1EN ~ 25/11/1998
Figure 8 - Removing the flue baffle

2.6. Mounting the tray

To avoid damage during transport, the tray has been
stored behind the main door.
- Fixed the tray, of the appliance (ill. 5). Center on tab "A"
and lower into place.

2.7. Chimney maintenance and sweeping

Very important : To avoid accidents (chimney fire, etc.),
regular maintenance should be carried out. If the stove
is regularly used, the chimney should be swept several
times per year, together with the stove pipe connection
section.
First remove the retainer grate (fig. 7), the two side
bricks (# 23 & 24, p. 22) and the flue baffle (fig. 8)
Chimney condition should be checked at least once per
year.
Réf. : 134 08 02
Notice de référence

Publicidad

Tabla de contenido
loading

Tabla de contenido