Figure 5. Attaching the Switch Rails
2.
After you have installed both switch rails, line them up on the previously
mounted Ready-Rails and slide the switch in until it is flush with front of
rack. About 3 inches before you fully insert your system, the rail locking
feature engages to keep the switch from inadvertently sliding out of the
rack and falling.
NOTE: Do not the use the mounted Ready-Rails as a shelf or a
workplace.
12