INSTALLATION CON'T.
4. Connecting the Natural Gas Supply Line (con't.)
5. The side burner is now ready to be installed in the enclosure. Take care not to damage the regulator during
installation.
After installing the side burner in the enclosure:
1. Connect the home gas supply line to the inlet side of the natural gas appliance
regulator by following the recommended connection methods noted above. Apply pipe
joint compound (not provided) to the inlet piping prior to connecting to the regulator.
2. Confirm all side burner control knobs are OFF.
3. Turn ON the home gas source.
4. Proceed to step 5, Leak Testing.
NOTE: It is recommended that a manual shut-off valve be installed
outside the side burner enclosure (see Figure 8).
Figure 7
Side View
11
Enclosure
Natural Gas
Regulator
Gas Inlet Pipe
Dedicated Manual
Shut Off Valve
Gas Inlet Pipe
Enclosure
Figure 8
Top View
To Gas System