Bradley S19-120 Manual De Instalación página 4

Ocultar thumbs Ver también para S19-120:
Tabla de contenido

Publicidad

S19-120, S19-120A
Assembly of Components and Parts List - S19-120
4
5
6
Item
Part No.
Qty.
1
S30-059
1
1.1
S27-278
1
1.11
110-214
1
1.2
140-720
1
1.3
124-048
1
1.4
128-129
1
1.5
142-002DC
1
2
128-156A
1
4
1
1" NPT
Supply Inlet
1.1
1.2
1.3
1.5
1.11
3
2
NOTE: Use
teflon tape
only.
Description
Stay-Open Ball Valve Assembly
Ball Valve with Jam Nut
Jam Nut (only)
Stop Bracket
Washer
Handle
Lockwasher
Pull Rod - 25½" Long
5/30/2012
1.4
NOTE: Items 1.1–1.5 come preassembled as Item 1.
Item
Part No.
3
151-001
4
113-006LK
5
169-847
6
S24-188
7
204-421
8
114-050
9
269-915
Bradley • 215-148 Rev. Y; ECN 12-05-016A
8
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY
FAX: (262-251-5817)
http://www.bradleycorp.com
114-050
R
P.O. Box 309, Menomonee Falls, WI 53051
TEST THIS UNIT EACH WEEK
DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.
ESSAI HEBDOMADAIRE
Test-operate valve(s) each week and sign below.
7
Report any malfunctions immediately.
Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt
durch Unterschrift. Jegliche Störung sofort melden.
Test le fonctionnement des valves chaque semaine et
signe en bas. S'il y à quelque chose qui ne va pas fait
un rapport immédiatement.
Date
Signed
Date
Signed
Datum
Unterschrift
Date
Signed
Date
Signe
Date
Signed
Qty.
Description
2
Curtain Hook
1
Pipe 1" NPT x 12" Long
1
90° Elbow 1" NPT
1
Plastic Showerhead Assembly
1
Emergency Tag
1
Safety Sign
1
Grip Pad (not shown)
Installation

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

S19-120a

Tabla de contenido