Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

EN
Appendix:
1. Loads which can be controlled directly by the Load Disconnect output of the BMS
Inverters:
All Phoenix inverters VE.Direct
Connect to the left hand terminal of the 2 pole connector
Phoenix 12/800; 24/800; 48/800
Phoenix 12/1200; 24/1200; 48/1200
Connect to the right hand terminal of the 2 pole connector
DC-DC converters:
All Tr type DC-DC converters with remote on/off connector,
and Orion 12/24-20; 24/12-25; 24/12-40; 24/12-70
Connect to the right hand terminal of the 2 pole connector
Battery Protect and Smart Battery Protect
Connect to the right hand terminal of the 2 pole connector
Cyrix -Li-Load
Connect to the control input
2. Loads for which an inverting remote on-off cable is needed
(article number ASS030550100)
Phoenix 12/180; 24/180; 12/.250; 24/350
All Phoenix VE.Bus inverters rated at 3kVA and more
3. Solar charge controllers which can be controlled directly by the Charge Disconnect output
BlueSolar MPPT 150/70 and 150/80 CAN-bus
Connect to the left hand terminal of the 2 pole connector (B+)
SmartSolar MPPT 150/45 and higher, 250/60 and higher
Connect to the right hand terminal (marked + or H) of the 2 pole connector
4. Solar charge controllers for which a VE.Direct non inverting remote on-off cable is needed
(article number ASS030550310)
All BlueSolar models, except the two CAN-bus models
SmartSolar MPPT up to 150/35

5. Battery Chargers

For Skylla TG battery chargers a
Non inverting remote on-off cable is needed
(article number ASS030550200)
For Skylla-i battery chargers a
Skylla-i remote on-off cable is needed
(article number ASS030550400)
Other battery chargers:
Use a Cyrix-Li-Charge
5

Publicidad

Tabla de contenido
loading

Tabla de contenido