York EKKC 12 D Instrucciones De Instalación página 17

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 7
Make sure the correct poles
are connected on both units
(Fig. 12)
Panel installation.
1. Position the panel on the indoor unit,
positioning the corner of vein motor in
the indoor unit piping corner.
2. Installation of the decorative panel:
(1) From the tab located on the other side of
the vein motor of the decorative panel,
hang the supplied support temporarily.
(2 positions)
(2) Also hang the two remaining tabs
temporarily. Be sure to avoid the vein
motor cable from sticking to the filler
material.
(3) Insert and tighten the 4 hexagonal
PIPES
2
VEIN MOTOR
3
4
INDOOR UNIT
CEILING
AIR DISCHARGE
SUPPORT
FILLING MATERIAL
FRONT PANEL
Fig. 12
GB
by johnson controls
screws on the right, aprox. below the
tabs. (The panel will rise 15 mm.)
(4) Adjust the panel by turning in the
directions indicated in Fig. A, so as to
completely cover the opening in the
ceiling.
(5) Tighten screws until the distance
between the indoor unit and the panel
is about 5-8 mm.
1
TAB
2
17

Publicidad

Tabla de contenido
loading

Tabla de contenido