Descargar Imprimir esta página

SATA AE5302 Manual Del Uso página 43

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 234
The height of the sub-lift shall not be greater than that of the main lift
2.3.5 Taking the main lift as the benchmark, lift the sub-lift to place the main lift and sub lift at the same level, and turn the red handle to close the
high-pressure valve. When the Main Lift and Sub Lift are adjusted properly, set the Work/Adjust switch to Work, and set the time relay to 1.5~2s.
Main lift
Sub-lift
Oil filling instructions for Sub Lift
2.3.6 Turn the changeover switch on the control panel to the "Main Lift"position, set the time relay to 0, and connect the air supply.
Main Lift
Sub Lift
2.3.7 Press the Up button to lift the main lift to about 30cm (i.e., below the height where the safety device is to be locked, rather
than the highest position; at this time, the two oil-filling ball valves shall be at the Close position).
During oil filling of Sub Lift 30-35cm
Do not lift the main lift to the highest position
2.3.8 Turn the Work/Adjust switch to the Adjust position and set the red handle of the Sub Lift high-pressure valve to the Open position.
Work
Adjust
AE5302/AE5302-3
Close
Open
Red handle
中文
After oil filling
Red handle
of Main Lift
and Sub Lift
Air
Connect the air supply
EN
DE
RU
KO
PT
Work
Adjust
JA
ES
43

Publicidad

loading

Este manual también es adecuado para:

Ae5302-3