Jacuzzi sasha Manual De Instalación página 20

Ocultar thumbs Ver también para sasha:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 101
- (
5S, detail 3) In the instance where a cable radio system is
present, connect it to the electrical box, as indicated.
NOTE: if, on the other hand, an audio kit (optional) is present, refer
to the audio kit documentation.
NOTE: The audio system (cable radio system or optional audio kit)
can be installed in the compartment of any of the walls .
- (
5S, detail 4) Where present, connect the building alarm
system to the indicated terminals.
NOTE: the terminals to which you must connect, are normally-open (NO)
contacts powered by a relay, which can be powered to both 220/240 V
and low voltage, but with maximum power absorption equal to 5 A.
- (
5S, detail 5) Unroll the temperature sensor (SO) cable and
allow it to pass through the grooves (the highest ones) located
at the wall end.
- (
5S, detail 5) Unwind the display (1) cable and allow it to
pass via these same grooves.
- (
5S, detail 6) Thread the bench light cable (6) through the
lower grooves and route it towards the outside.
- (
5S, detail 7); Install the isolating multi-pole switch (with
the cable already connected to the appliance's junction box) in
an area that complies with the safety regulations as specified by
current legislation in force.
The "sauna's" power supply will be connected to this switch.
NOTE: in the instance of a single-phase power supply
(220/240 V ~), you must suitably connect the terminals rela-
tive to the phases, as indicated.
IMPORTANT: for Countries where 220-240V voltage is
supplied by a two-phase system (L+L), the connection
has to be made on terminals L and N anyway.
- (
5S, detail 8) Make sure, that with the sauna module, the con-
tacts indicated are NOT connected to each other, as displayed.
- (
5S, detail 9) Centring the wall on the base frame, install it
in such a way so that the wood dowel is inserted into the frame.
Subsequently, use a rubber mallet if necessary.
Hammam walls:
- (
5H, detail 1) In the instance where a cable radio system is
present, connect it to the electrical box, as indicated.
NOTE: if, on the other hand, an audio kit (optional) is present, re-
fer to the audio kit documentation.
NOTE: The audio system (cable radio system or optional audio kit)
can be installed in the compartment of any of the walls .
- (
5H, detail 2) Where present, connect the building alarm
system to the indicated terminals. NOTE: the terminals to which
you must connect, are normally-open (NO) contacts powered by a
relay, which can be powered to both 220/240 V and low voltage, but
with maximum power absorption equal to 5 A.
- (
5H, detail 3) Unroll the temperature sensor (SO) cable and
allow it to pass through the grooves (the highest ones) located
at the wall end.
- (
5H, detail 3) Unwind the display (1) cable and allow it to
pass via these same grooves.
- (
5H, detail 4) Thread the bench light cable (6) through the
lower grooves and route it towards the outside.
- (
5H, detail 5) Connect the power supply to the junction box
(CP) as follows:
- 220/240V ~
(steam generator power: 4.6 kW)
Connect the power supply as indicated, additionally connect-
ing the jumper cables to the indicated terminals.
- 220/240V ~
(steam generator power: 6 kW)
Connect the power supply as indicated, additionally connect-
ing the jumper cables to the indicated terminals.
IMPORTANT: for Countries where 220-240V voltage is
supplied by a two-phase system (L+L), the connection
has to be made on terminals L1 and N anyway.
- 380/415V - 2N ~
(steam generator power: 4.6 kW)
Use two phases (in addition to neutral) and connect the pow-
er supply to the indicated terminals.
- 380/415V - 3N ~
(steam generator power: 6 kW)
Use 3 phases (in addition to neutral) and connect the power
supply to the indicated terminals.
- (
5H, detail 6) Make sure, that with the hammam module,
the contacts indicated ARE connected to each other, as dis-
played.
- (
6H, detail 1) Draw the wall to the wall connections and
connect these to the mixer system using the flexible pipes sup-
plied.
- (
6H, detail 2) Connect the yellow-green cable to the faston
connector on the mixer system.
- (
6H, detail 3) Connect the pipe coming from the drain with
rubber hose connection to the coupler of the steam generator's
drainage system.
- (
6H, detail 4) Centring the wall on the base frame, install it
in such a way so that the wood dowel is inserted into the frame.
Subsequently, use a rubber mallet if necessary.
- Route the mixer system pipe upwards that will be connected to
the roof showerhead (see chap "Installing roofs")..
20

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Sasha 2.0

Tabla de contenido