Jacuzzi sasha Manual De Instalación página 21

Ocultar thumbs Ver también para sasha:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 101
(detail 4a) During assembly, take care not to damage
the panel ends.
Installation of remote control system
(where present)
Where present, carry out installation of the equipment by con-
sulting the provided documentation;the control system can be
installed either to the sauna or to the hammam.
System configuration (micro-switches)
All models
(
sc) Check that the configuration of the "A" and "B" switches is
as per indicated in the diagram and that the "C" switches are posi-
tioned according to the parameters relative to the desired instal-
lation, that is:
1: - turn the switch to ON with the HAMMAM module;
- turn the switch to OFF with the SAUNA module;
2: - turn the switch to ON where installation of the Jacuzzi® audio
kit is planned;
- turn the switch to OFF otherwise;
3: - check that the switch is in the ON position.
4 (only sauna module)
- turn the switch to ON to set a sauna function for a maximum of
12 hours;
- turn the switch to OFF to set a sauna function for a maximum
of 6 hours;
CAUTION: do not set a 12 hour time frame if the
equipment is to be used for personal use.
5: - turn the switch to ON if you wish to carry out a demo function
of the equipment (trade fair, exhibition);
- turn the switch to OFF where normal operation is desired.
6: - turn the switch to ON where installation of the Jacuzzi® remote
control system is planned;
- turn the switch to OFF otherwise;
7: - sauna module: - turn the switch to OFF with the SAUNA mod-
ule;
- hammam module: turn the switch to ON where automatic
filling of the anti-scaling agent is planned.
- turn the switch to OFF otherwise;
8: - press the switch to save the remote control system positioning
(refer to the documentation that comes with the system itself).
Installing the side walls
(
7, details 1-2) Using the suction lifter, draw the lower side
wall towards the base wall (Sauna: wall with vent) and thread
the speaker cables via the grooves (below) of the base wall.
Then connect them to the audio box.
(
7, detail 3) Thread the bench light cable (6) into the con-
duit and allow it to pass out of the other end until it aligns with
the central hole in the panel.
Apply the foam rubber cylinder to the cable and provisionally
attach it (it will be inserted into the panel hole once the bench
is positioned).
(
8) Install the lower wall to the base frame so that:
- (detail 1) the fasteners located at the ends are inserted into
the fasteners on the base wall,
- (detail 2) the wood dowel is inserted into the frame. Subse-
quently, use a rubber mallet if necessary.
(
9) Using the suction lifter, draw in the upper wall and in-
stall it as per the instructions described above.
Then, thread the following cables into the conduit supplied:
- temperature probe (SO)
- display (1)
These cables must protrude from the display unit.
Check that the walls are completely perpendicular.
Installing the vertical wall
(
10, detail 1) Remove the glazing bead from the vertical
wall; install the wall so that:
- (detail 2) the end fasteners are inserted into the fasteners on
the base wall,
- (detail 3) the wood dowel is inserted into the frame profile.
- (detail 4) the metal dowels are inserted into the vertical profile.
NOTE: these dowels are adjustable so that any positioning errors
can be corrected.
(
10, detail 5) Attach the profile to the metal dowels.
(
10a, details 1-2-3) Remove the glazing bead and then at-
tach the vertical profile to the vertical wall.
(
10a, details 4-5) Screw the supports under the wall and in-
stall it to the lower glass frame in such a way that the metal dowels
are inserted into the vertical profile.
NOTE: these dowels are adjustable so that any positioning errors
can be corrected.
(
10a, details 6-7-8-9) Check the spirit level of the wall and
adjust the supports so that they rest completely on the ground.
Then, attach the profile to the metal dowels.
Installing the glass profile
(
11, details 1-2-3-4) After having removed the glazing
bead, install the glass panel by inserting it into the metal dowels,
ensuring that it is flush with the walls.
NOTE: these dowels are adjustable so that any positioning errors
can be corrected.
(
11) Attach the glass profile:
- (detail 5) to the metal dowels,
21

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Sasha 2.0

Tabla de contenido