Installation
Disconnect the supply voltage!
• Lead the bus line into the flush-mounted box from the
top or the side.
• Lead the load-curcuit lines into the flush-mounted box
from the bottom or the side.
• Connect the bus lines in accordance with the connection
diagram, Fig. 3. The bus line can be looped through to
other EIB installation users.
• Clip on the bus terminal block.
• Connect the load-current lines to the terminals in accord-
ance with the connection diagram, Fig. 3 (see also
chapter "Technical Data").
• Put the device in its installation position.
Check to ensure that the minimum distance between
the lines of the bus terminal and load circuit is observed
and secure the device in the flush-mounted box.
• Enter the physical address - see following chapter.
• Only then, clip on the intended application. In so doing,
pay attention to the appurtenant operating instruc-
tions.