Attention: Mount the casing prior to connecting the unit to the flue!
Contents:
Check the contents of the package against the
list below and inspect for damaged items.
Assembly instructions
-
Place the lid 1 on the pins 6 on the boiler body.
-
Place the boiler control panel 5 on the lid and introduce the probes through the lid opening and into the sleeves.
Please refer to the enclosed instructions for detailed information on the boiler control panels.
-
Introduce burner control cable 8 through the lower opening, push it in and then feed it upwards along the left
hand side of the boiler body. Then, insert the cable through the lid opening 1 into the boiler control panel. Finally,
fasten cables at an adequate length (in such a way that the connectors on the burner have to be pulled to open
the door) in the holes provided in the opening using the cable clamp 9. Insert remaining control panel cables
through the opening and push them into the raceway towards the back.
-
Insert the control panel into the foreseen support.
Fold the tongues at the bottom of the side panels 2 by 90° towards the front. These serve as stops for the mag-
-
nets of the front panel.
-
Snap the side plates 2 to the lid and fasten them to boiler feet with washers 10 and screws 11.
-
Fold the tongue of the rear panel 3 by 90° towards the front.
-
Fasten the rear panel 3 to the lid and side panels with the screws provided 7.
Snap the front panel 4 to the front part of the lid and slide it downwards between the side plates until the magnets
-
click to the stops.
Montageanleitung Instruction de montage
Assembly guide
Instruccion de montaje
-
Lid 1
-
Side panel 2
-
Bag containing screws
-
Rear wall 3
-
Front panel 4 (optional, separately packed)
-
Boiler control panel 5 (delivered inside
combustion chamber)
Guida di montaggio
Montageaanwijzing
It might be necessary
to drill new holes in
the lid.
Seite 4 von 7