2. Inspection

2.1 Receiving Inspection

Unpack the equipment carefully and check for any damages which may have arisen during transport. Please contact your
supplier for technical support.
2.2 Listing of Items
The package includes the following items:
3. Installation
1. Check voltage specified on the nameplate that is on the bottom. Make sure that it matches the line voltage in your
location.
2. Install the instrument in a clean, dust-less and ventilated area under 40℃.
3. Keep at least 10 cm of spare space around the instrument.
4. There are two screws under the sterilizer housing, there is also one nut for each screw. Let the screws pass through
the round hole and ellipse hole of holding rack. Then lock the nuts on the screws by hex wrench.
Note:
If there is any apparent damage to the system,
please do not plug it into the power line.