Installation; Boiler Fixing - Riello 40 GS10/M Instrucciones Para La Instalación, Uso Y Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

3.

INSTALLATION

After carefully cleaning all around the area where the burner will be installed, and arranging the correct lighting of
the environment, proceed with the installation operations.
All the installation, maintenance and disassembly operations must be carried out with the electricity
supply disconnected.
DANGER
The installation of the burner must be carried out by qualified personnel, as indicated in this manual
and in compliance with the standards and regulations of the laws in force.
WARNING
Combustion air inside the boiler must be free from hazardous mixes (e.g.: chloride, fluoride, halogen);
if present, it is highly recommended to carry out cleaning and maintenance more frequently.
DANGER
After removing all the packaging, check the integrity of the contents.
In the event of doubt, do not use the burner; contact the supplier.
CAUTION

3.1 BOILER FIXING

Separate the combustion-head assembly from the burner
body by removing nut (1) and removing group (A).
Fix the head assembly group (B) to the boiler (2) insert the
equipped insulating gasket (3).
A
20067072
1
3
D5098
B
2
4
GB
HINGE ASSEMBLY
S7393

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

20066426729t2

Tabla de contenido