STOTT PILATES SPX Manual Del Propietário página 15

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

2082H-5 OwnersManual-SPX_2082H-2 OwnersManual-SPX 12-07-13 2:31 PM Page 15
REQUIRED TOOLS:
-
FL T
HE D SCREWDRIVER
TWO OPEN
1/2" (13
Insert spring bolt through the corresponding hole
3
on spring anchoring bar.
Hold fixed cube nut in place with 7/16" wrench.
5
Using second wrench, tighten the new nylon locknut.
NOTE: DO NOT REUSE
Repeat steps 1 to 6 for remaining springs.
7
-
END WRENCHES
)
7/16" (11
)
MM
X
MM
old nylon locknuts.
Thread nylon locknut into spring bolt.
4
Both nylon locknut and fixed cube nut should be
6
snug against the spring anchoring bar.
Write date of installation on the sticker provided
8
with spring replacement package. Affix sticker
on the underside of Reformer carriage.
Springs should be replaced every 24 months,
or as needed within that period.
15

Publicidad

Tabla de contenido
loading

Tabla de contenido