2082H-5 OwnersManual-SPX_2082H-2 OwnersManual-SPX 12-07-13 2:31 PM Page 15
REQUIRED TOOLS:
-
FL T
HE D SCREWDRIVER
TWO OPEN
1/2" (13
Insert spring bolt through the corresponding hole
3
on spring anchoring bar.
Hold fixed cube nut in place with 7/16" wrench.
5
Using second wrench, tighten the new nylon locknut.
NOTE: DO NOT REUSE
Repeat steps 1 to 6 for remaining springs.
7
-
END WRENCHES
)
7/16" (11
)
MM
X
MM
old nylon locknuts.
Thread nylon locknut into spring bolt.
4
Both nylon locknut and fixed cube nut should be
6
snug against the spring anchoring bar.
Write date of installation on the sticker provided
8
with spring replacement package. Affix sticker
on the underside of Reformer carriage.
Springs should be replaced every 24 months,
or as needed within that period.
15