3 INSTALLING
Below are all the steps necessary to ensure the correct operation of the WEG Motor Scan, relating each step to
a specific document that contains detailed information on the step.
3.1 SENSOR SETUP AND INSTALLATION STEPS
3.2 GATEWAY SETTINGS AND INSTALLATION STEPS
Procedure
User, customer and
plant registration on
the MFM platform.
Go to http://mfm.
wnology.io
APP installation on
the smartphone
Sensor
activation
Sensor
setup
Subscription
assignment
Mechanical
installation
on the motor
Procedure
Gateway settings
o n t h e M F M
platform
Internet access
settings
Field installation
Document
WEG Motor Fleet
Management Manual
10008443991
MobileApp Manual
10008443215 Motor
Scan Mechanical
Installation
Document
10008451731
CassiaX1000 Gateway
Overview of Receipt to Operation | 6
Installing