4.1 Installing the Lifting Jack (Figure 12)
1. On 50 and 100 ton units, attach one of the small angle
brackets to the top right frame spacer (E) using two
5
⁄
-11 X 1
1
⁄
" long capscrews,
8
2
2. For all models, grasp the jack plunger (F) and pull it all the
way down through the hole in the mounting bracket (G).
3. Position the lifting jack on the mounting bracket (G).
The coupler (H) must face outward. Use two
bolts, lockwashers and nuts (I) to secure the jack to the
mounting bracket (G).
G
I
4.2 Installing the P-51 Hand Pump (Figure 13)
1. Install the other small angle bracket on the frame
spacer mid-way up the right side of the frame. Use two
5
⁄
-11 X 1
1
⁄
" long capscrews, lockwashers and nuts.
8
2
J
5
⁄
" lockwashers and nuts.
8
1
E
H
F
Figure 12
N
L
M
K
Figure 13
2. Position the P-51 hand pump on the angle bracket (J),
with the handle opening facing left. Mount the pump to
the bracket using four
lockwashers and nuts (K).
3. Remove the shipping plug from the top of the P-51
pump reservoir. Install the unpainted vent plug (L).
4. Remove the shipping plug from the lower front pump
outlet port. Install the 90° elbow (M), provided, into the
⁄
-20 X 3"
4
outlet, facing upward. Attach the 6 ft. long
hydraulic hose (N) from the pump elbow to the lifting
jack coupler. Tighten the coupler.
P-462, P-464 and some Air and Electric Pumps
P-80, P-84, P-391 and P-392 Hand Pumps
2
6
1
⁄
-20 X 1
1
⁄
4
4
1
3
7
5
6
Most Electric Pumps
1
4
7
5
6
3
8
5
6
6
7
7
Submerged Pumps
1
9
PUJ1200B Electric Pump
5
1
7
4
6
Figure 14
" long capscrews,
1
⁄
" I.D.
4
2
2
4
2
2