Install the Cross Lever Handles (cont.)
Install another O-ring onto the spindle end that protrudes
through each center cap. Thread the female end of each short
stud onto each protruding spindle end and tighten.
6. Complete the Installation
Make sure all the connections are tight.
Open the drain.
Turn on the main water supply and check for leaks.
Open the hot and cold valves and check for leaks.
Run the water for about a minute and turn off.
117124-2-A
8
Kohler Co.