Descargar Imprimir esta página

CLAS PE 2002 Manual De Instrucciones página 87

Publicidad

Idiomas disponibles

Idiomas disponibles

PE 2002
PE 2006
RESERVED TO THE INSTALLER
CHECK TO BE CARRIED OUT WHEN THE INSTALLATION IS COMPLETE
LIFT MODEL......................................................................
1
CHECKING CORRECT INSTALLATION AND SEALING CAPACITY OF SCREW SECURING LIFT TO FLOOR
2
CHECKING CORRECT ELECTRIC HOOK-UP (ACCORDING TO STANDARDS)
3
CHECK OF CORRECT OPERATION (ACCORDING TO MANUAL)
4
CHECK OF THE ELECTRIC SAFETY DEVICE CORRECT OPERATION
5
CHECK FOR CORRECT EMERGENCY PUSH-BUTTON OPERATION
6
CHECK OF MECHANICAL SAFETY DEVICES CORRECT ENGAGEMENT
7
CHECK OF ARM-LOCK CORRECT ENGAGEMENT
8
CHECK OF FOOT GUARDS CORRECT ASSEMBLY
9
CHECK OF HYDRAULIC SYSTEM PERFECT SEALING
10
CHECK OF THE HYDRAULIC SAFETY DEVICES CORRECT OPERATION
11
CHECK OF OIL LEVEL
12
CHECK FOR EMERGENCY LOWERING OPERATION
13
CHECK OF LABEL APPLICATION ACCORDING TO DIAGRAM
14
CHECK CORRECT LUBRICATION OF THE SLIDING AREAS
15
FULL-LOAD LIFT TESTING
16
TRAINING OF THE PERSONNEL AUTHORISED TO USE THE LIFT
17
CHECK OF DOCUMENTS (instruction manual & Declaration of Conformity)
18
INSPECTION RECORDS FILLING OUT
NOTE
Date
Signature of Installer
PE 2007
Customer's signature
SERIAL NO.......................................
YES
NO
NOTES
87

Publicidad

loading

Productos relacionados para CLAS PE 2002

Este manual también es adecuado para:

Pe 2006Pe 2007