2x4 Bracing
Hot Supply
2. Roughing-In
Showerhead/Bath Spout Installations
For Back-to-Back Installations: Proceed to the "Install the Supply
Piping and Valve, Back-to-Back" section.
Route the supplies and install the valve. Refer to the roughing-in
illustration for your installation.
NOTE: The position of the 2x4 bracing is dependent on the
thickness of your finished wall.
Install 2x4 bracing behind the plate as shown.
Install bracing at the showerhead and bath spout outlet
installation locations.
Connect the water supplies using 1/2" copper, CPVC, or PEX
components. Use thread sealant on all threaded connections.
Proceed to the "Route the Piping" section for your installation
configuration.
Kohler Co.
2-1/16" (52 mm)
72" (1829 mm) –
78" (1981 mm)
To Floor
(Typical)
7" (178 mm) –
2-3/4" (70 mm)
18" (457 mm)
[10" (254 mm)
2-1/16" (52 mm)
Recommended
4" (102 mm)
Cold Supply
2-3/4" (70 mm) –
3-1/2" (89 mm)
7
Finished Wall
Thin Wall
Finished
Wall
Thick Wall
1128093-2-E