Mounting
Frame
Front View
PVC
Elbow
Drain
Clamp
Electrical
Box
2. Prepare the Carriage
Install the Drain Clamp
Unpack and inspect the carriage.
NOTE: If using 2x6 studs, install the mounting frame reversed into
the back notches.
Install the mounting frame into the front notches on the bottom
of the carriage.
Insert the PVC elbow into the mounting frame.
Secure the elbow in place with the drain clamp. Push the clamp
into the frame until it locks into place.
Install the Electrical Box - Bidet Installations
NOTE: The 1201721 electrical box kit is required when the K-4744
bidet seat will be paired with the bowl. Skip this step for standard
installations.
Connect the electrical box to the carriage at the location shown.
1246750-2-A
Back View
6
Kohler Co.