Kohler K-18829 Guía De Instalación Y Cuidado página 9

Ocultar thumbs Ver también para K-18829:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Lag Bolts
4. Install the Carriage
Align the carriage flush with the front edge of the studs. The
front of the carriage should be flush with the front edge of the
studs or set back slightly for finished wall installation.
Check the front of the carriage for plumb.
Mark the hole locations for the six lag bolts, one for each foot and
two on either side of the carriage.
Drill pilot holes (remove the carriage if needed) to reduce the risk
of the lag bolts causing the studs to split or crack.
NOTE: If the carriage is installed onto a concrete sub-floor use
concrete expansion bolts (not supplied) when securing the feet of
the carriage.
Secure the carriage to the support studs using 2" (51 mm) long
(minimum) lag bolts (not supplied), one at each location.
Connect the Power - Bidet Seat Installations
WARNING: Risk of personal injury. Disconnect the power
before connecting the wires.
Kohler Co.
9
1246750-2-A

Publicidad

Tabla de contenido
loading

Tabla de contenido