Install the Valve (cont.)
Use thread sealant and connect the hot and cold water supply
lines to the valve inlet ports. Ensure that the corresponding water
supply lines are connected to the correct inlet ports.
NOTE: If the existing hot and cold plumbing makes this
configuration inconvenient or if it is advantageous to reverse the hot
and cold ports (such as back-to-back installations), see the "Reversed
Inlet Supplies" section.
For K-670 and K-680 valves, make certain that the integral
volume control/shut-off valve portion of the assembly is on top
when installed.
Connect the water outlet lines to the valve ports. Plug any
unused outlet port.
IMPORTANT! Secure the piping to the framing.
NOTE: When using the plaster guard to trace the cut-out, the tick
marks located outside of the guard will assist you in identifying the
spline centers.
Use the plaster guard to determine the depth of the valve in the
wall, and to trace the cut-out line in the wall material.
IMPORTANT! The finished wall must be within the MIN-MAX
depth shown on trim adapters 1, 2, and 3 of the plaster guard.
Turn on the water supply lines to the valves.
Run the water through the mixing valve, all showers, and the
spout.
Remove the plaster guard to access and inspect the valve.
Kohler Co.