Descargar Imprimir esta página

Leggett & Platt Symmetry SM Guía De Preparación página 7

Publicidad

Idiomas disponibles

Idiomas disponibles

SETUP
STEP 11
Install batteries in remote control. Use remote to verify base functions properly.
If base does not operate, see the Troubleshooting section of the User Guide.
See User Guide for programming instructions.
STEP 12
Lower base to flat position.
STEP 13
Install the mattress retainer at the foot end of the base.
Place one end of the mattress retainer into the outside hole of the left insert
and place the other end into the outside hole of right insert (FIGURE 8).
FIGURE 8
STEP 14
Place mattress on base to complete assembly.
7

Publicidad

loading

Este manual también es adecuado para:

Symmetry sp