Hand Control - Etac Molifit Air Tift Manual De Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 58
Installation
The hoist is marked with Safe Working Load (SWL), this should
not exceed rail systems max load capacity.
Minimum required height from floor to rail is 210cm.
50cm
Mounting Molift Air Tilt Sling bar
1.
Place sling bar under hoist and lower lifting band. DO NOT
LIFT SLING BAR UP TO LIFTING BAND.
2.
Align the sling bar in connection point.
3.
Push button on locking pin and insert all the way through.
4.
Make sure locking pin is properly fastened
5.
Push and hold down the button on the locking pin, and pull
to remove locking pin.
Min.
210cm
60cm
6.
Insert the plug on cable from actuator on Molift Air Tilt
Sling bar into the connector on Molift Air 350 Tilt.
7.
Tighten the connectors sealing ring by turning it clockwise.

Hand control

The Molift Air Tilt Hand control has 2 buttons for lifting and
lowering and 2 buttons for tilting the sling bar. The hand control
has an indicator light that will illuminate when battery level is low
and the hoist requires charging
Do not pull hand control to move the hoist
along the rail.
4
Molift Air Tilt / www.etac.com

Publicidad

Tabla de contenido
loading

Tabla de contenido