Descargar Imprimir esta página

Initial Operation - Cleco NeoTek 30EA Serie Manual De Instrucciones

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 40
mPro400GCD-P Global Controller
m-Pro-400GCD-P
Controller
Tool Cable
Tool Cable
Length
Part Number
ft.
961560-010
3.3
961560-020
6.6
961560-030
9.8
961560-040
13.1
961560-060
19.7
961560-080
26.2
961560-100
32.8
961560-120
39.4
961560-150
49.2
Extension Cable
Length
Part Number
ft.
961561-010
3.3
961561-030
9.8
961561-050
16.4
961561-060
19.7
961561-080
26.2
961561-100
32.8
961561-150
49.2
961561-200
65.6
961561-250
82.0
5

Initial operation:

The 30EA and 50EA series nutrunners have been configured
prior to shipment. A setting for your specific application must
be made with the controller by qualified
initial operation can vary depending on the programming of
the controller. Refer to the controller Programming Manual
for assistance.
→ Make sure the tool cable is securely attached to the tool
and controller.
→ Make sure the controller is powered on and properly
programmed.
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
1. Qualified personnel are those who can recognize possible hazards and institute the appropriate safety measures due to their professional
training, knowledge, and experience as well as their understanding of the relevant conditions pertaining to the work to be done. Qualified
personnel must observe the rules.
30EA Right Angle
Nutrunner Shown
Weight
m
lb.
kg
1
1.1
0.50
2
1.4
0.65
3
1.7
0.79
4
2.1
0.94
6
2.7
1.23
8
3.4
1.52
10
3.9
1.81
12
4.6
2.10
15
5.6
2.53
Weight
m
lb.
kg
1
0.8
0.38
3
1.5
0.67
5
2.1
096
6
2.4
1.11
8
3.1
1.40
10
3.7
1.69
15
5.3
2.41
20
6.9
3.14
25
8.5
3.86
1
personnel. The
Page 11
EN
→ Confirm the correct spindle rotation by looking at the
tool's 'CW/CCW indicator light'
→ Place the socket on the application and depress the start
switch to begin the rundown.
→ Only release the start switch after the tool shuts off and
the rundown evaluation was indicated by either the tool
or the controller.
→ The rundown cycle is now complete, remove the tool from
the application.
Maintenance
Implement a comprehensive safety maintenance program
to provide regular inspection for all phases of tool operation
and power supply.
Daily:
→ Visual inspection of all cables and connections.
→ Visual inspection of all external tool components.
→ Check the tool for excessive vibration or unusual noise.
TM12-1109-LG1
08/25/2017

Publicidad

loading

Este manual también es adecuado para:

Neotek 50ea serie