Two-Way Valve Installation (cont.)
Install temporary 1/2" nipples in the outlet ells so they extend a
minimum of 2" (5.1 cm) beyond the planned finished wall.
IMPORTANT! When testing the valve operation, your selections
should be as follows: Accessory 1, Accessories 1 and 2, Accessory 2.
If your valve operates as follows: Accessories 2, Accessory 2,
Accessories 1 and 2; you will need to remove the spacer, rotate the
detent 180° then reinstall the spacer.
Turn on the water supply to the transfer valve and check the
transfer valve for proper operation and leakage. Once everything
is verified, turn off the water.
Install caps on the temporary bath and shower nipples. Turn on
the water and check for leaks. Once no leakage is verified, turn
off the water.
Reinstall the plaster guard.
Complete the finished wall.
Remove and discard the plaster guard.
Install the trim according to the installation instructions packed
with the trim.
1173682-2-A
6
Kohler Co.