Supplies Required; Installation Instructions - Bradley S19-310BFSS Instrucciones De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
Installation

Supplies Required:

3
• (3)
" floor anchors and bolts
8
• Teflon tape and pipe sealant
• Piping to 1¼" NPT water supply inlet and 1¼" NPT
drain outlet on unit
• Adequate supply pipe supports
• Minimum 4" (102mm) drain to accommodate 30
gallons (115 liters) per minute discharge for shower
waste
• OPTIONAL: sign-mounting hardware
NOTE: Local codes may require the installation
of a backfl ow prevention valve to complete proper
installation. Compliance with local codes is the
responsibility of the installer. Valve must be tested
annually to verify that it is functioning properly. Backfl ow
prevention valves are not included with the fi xture and
may be supplied by the contractor or purchased from
Bradley Corporation.
Step 1: Secure base to floor
1. Install three suitable anchors (supplied by
3
installer) for
" bolts in the floor.
8
2. Bolt the base to the floor anchors using
bolts (by installer).
Step 2: Assemble components
1
. Assemble the remaining unit components as
shown on page 4.
• Apply pipe sealant (by installer) to all male-
threaded pipe joints.
Use the rubber grip pad provided or
a strap wrench around pipes when
tightening to prevent marring the
Bradtect® protective, safety yellow
coating. Place the grip pad on the pipe,
then put the wrench over the grip pad
and turn the pipe with the wrench.
• Thread the jam nut onto the threaded end
of the pull rod. Thread the pull rod onto
the coupling and tighten the jam nut. The
triangular end of the pull rod must be in
line with the hook end (see page 4).
• The bottom edge of the showerhead should
be 91" (2310mm) to the bottom of the base.
Step 3: Connect water supply
IMPORTANT: Do not rely on
Bradley's Combination Unit to
support supply piping.
1. Connect water supply piping to 1¼" NPT inlet
on unit (piping by installer). Provide adequate
supports (by installer) for supply pipe using pipe
hangers or other means.
2. Connect drain piping to 1¼" NPT drain outlet on
unit (piping by installer).
3. Hang the safety sign from the unit with the
curtain hooks provided (or mount it to the wall
using sign-mounting hardware by installer).
NOTE: All dimensions assume standard thread
engagement. Variations in manufacturing allow for
+/-
1
" (3mm) per threaded joint. To fi nd the tolerance
8
of a dimension, add the number of thread joints in
between a dimension and multiply it by
Bradley Corporation • 215-619BFSS Rev. W; ECM 10-05-022
3¾"
(95mm)
Ø 2"
(51mm)
91"
(2310mm)
to Bottom
of Base
3
"
8
1
" (3mm).
8
34
"
3
8
(873mm)
45"
(1142mm)
9"
(229mm)
52
3
"
8
(1330mm)
to Bottom
of Base
24"
(610mm)
to Bottom
of Base
(152mm)
Ø 10¾"
(273mm)
10
3
8
(264mm)
Top View From Bowl
3/15/10
S19-310BFSS
(1664mm)
to Bottom
of Base
5
"
7
8
(150mm)
30
3
"
8
(772mm)
to Bottom
of Base
6"
19"
(483mm)
Ø 9" (229mm) Flange
with (3) Ø
3
" (10mm)
8
Holes on Ø 8" (203mm)
Bolt Circle
"
65½"
3

Publicidad

Tabla de contenido
loading

Tabla de contenido