VESTEL EVC04 Serie Guia De Instalacion página 21

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Before closing the cover of the charging station, check instructions
in sections 2.6 and 2.7 if any function related to these sections are
used.
1-
Open the product front cover following the instructions for cover opening under section 5.2.
2-
Center the charging station using the alignment template, and mark the drill bit holes with a
pencil.
3-
Drill the wall on the marked points using the impact drill (8mm drill bit).
4-
Place the dowels into the holes.
5-
Tighten the security scews (M6x75) of the product using Torx T25 Security Screwdriver.
6-
Insert the open lead wires into the charging station through the hole on the lower left. Follow
the AC Mains Connection instructions on the next pages, see section 2.3 or 2.4 depending on the
model of the charger. (Single/Three Phase)
7-
Tighten the cable glands as shown in the figure. Before close the cover of the charging station,
follow instructions in sections 2.6 and 2.7 if any function related to these sections are used.
NOTE : Also check section 3 commissioning.
8-
To close the cover of the charging station, tighten the cover screws that you removed before
with Torx T20 Security L-Wrench or Right Angle Screwdriver Adapter using Torx T20 Security Bit.
9-
Mounting the charging station on wall is now finished.
IG v7.3.0 2020
8
Figure-10
© 2020 Vestel - All rights reserved
8
9
English - 20

Publicidad

Tabla de contenido
loading

Tabla de contenido