Descargar Imprimir esta página

Cooper Lighting FAIL-SAFE CFA Instrucciones De Instalación página 4

Publicidad

Idiomas disponibles

Idiomas disponibles

Step 7
Optional
For customized top access, follow directions in Step 3 to
locate holes.
Housing (A)
Step 8
Slide all bracket supports along channel so supports touch
end plates.
Run wiring (Hot/Neutral/Ground) to each fixture.
Connect all Hot/Neutral/Ground wires to housing side of
power connectors with wire nuts or crimp connectors.
Reattach power connectors.
4
1/2" Conduit Fitting
(by others)
Lock Nut (by others)
Installation Instructions – CFA
IS-083
ADC140279
Secure each Power Tray© with (2) Hex Nuts (I) into each
Housing (A).
Install lamps. Refer to ballast for proper lamp type.
Install Lens (B) by gently squeezing and inserting a few
inches at a time from one end to the other.
Ground
Hex
Nut (I)
Power
Connectors
Lens
(B)
www.cooperlighting.com
Wiring From
Ground
Conduit Or
Hot
Other Fixture
Neutral
Housing (A)
Power
Tray
©
Hex
Nut (I)
Lamp T-8
Shown (by
others)

Publicidad

loading

Productos relacionados para Cooper Lighting FAIL-SAFE CFA