RECOMMENDED INSTALLATION FOR ALL APPLICATIONS
1. Electrical wiring and protection must be in accordance with governing
electrical codes.
2. Install proper Zoeller Unicheck (combination union and check valve),
preferably just above the basin to allow easy removal of the pump
for cleaning or repair. If high head or below-cover installation is
required, use 30-0164 on 1-1/2" (DN40) pipe, 30-0152 on 2" (DN50) pipe
and 30-0160 on 3" (DN80) pipe.
3. All installations require a basin cover to prevent debris from falling into
the basin and to prevent injury.
4. When a Unicheck is installed, drill a 3/16" (5 mm) diameter hole in the
discharge pipe even with the top of the pump. NOTE: THE HOLE MUST
ALSO BE BELOW THE BASIN COVER AND CLEANED PERIODICALLY.
(High Head unit see "Caution" on front page). Water stream will be
visible from this hole when pump is operating.
5. Securely tape or clamp power cord to discharge pipe, clear of the float
mechanism(s).
6. Use a discharge pipe equivalent in diameter to the pump's discharge.
7. Basin must be in accordance with governing codes and specifications.
See FM0531, FM0732, FM1597 & FM1420
for alarms, controls & junction boxes
1
10
2
12
13
3
MINIMUM
18"x24" BASIN
(457 mm X 610 mm)
5
LARGER DEPTHS
MAY BE
6
REQUIRED.
4
7
8
14
9
4" (10 cm) OF GRAVEL
TYPICAL DEWATERING INSTALLATION
All installations must comply with all applicable electrical and plumbing codes, including, but not limited to, National Electrical Code, local, regional, and/or state
plumbing codes, etc. Not intended for use in hazardous locations.
On some installations, it may be desirable
to install an independent hanger for the
level control switches to avoid possible
hang-ups on the pumps, piping, valves,
etc. Float hangers are available from
Zoeller Company on Catalog Sheet FM0526
or can be fabricated from standard pipe
and fittings.
Always refer to
FM0551 and/or
SSPMA recom-
mended sewage
pump installation
and maintenance.
TURN
ON
TURN
OFF
SK292
TYPICAL SEWAGE INSTALLATION
Suggested Methods of Float Installation
TYPICAL FLOAT HANGER ON STEEL COVER PITS
PEA GRAVEL
© Copyright 2020 Zoeller
8. Pump must be level and float mechanism(s) clear of sides of basin
before starting pump.
9. Basin must be clean and free of debris after installation.
10. Gate valve, shut-off valve, or ball valve to be supplied by installer and
installed according to any and all codes.
11. Locate float switches as shown in sketches. The best place for the "off"
point is above the motor housing and positioned 180° from the inlet.
Never put "off" point below discharge on pump
12. Gas-tight seals are required to contain gases and odors.
13. Vent gases and odors to the atmosphere through vent pipe. Must comply
with local codes but not required for dewatering.
14.
Optional pump stand (P/N 10-2421) eliminates the need for blocks or
bricks under the pump. For use with effluent and dewatering pumps only.
15. Optional watertight control box available, see FM1597 for details.
16. For proper spacing of "On" - "Off" switches refer to local or
national standards and guidelines.
17. Optional septic tank risers for easy access to pump, controls and filters.
See FM0531, FM0732, FM1597 & FM1420
for alarms, controls & junction boxes
4" (100 mm)
OF GRAVEL
SK290
ACCESS COVER
STANDARD PIPE
FLANGE
PVC OR LIGHT WEIGHT
STAINLESS STEEL PIPE
SK1217
Co. All rights reserved.
®
3
WW1
EFFLUENT
FILTER
TYPICAL EFFLUENT INSTALLATION
TYPICAL FLOAT HANGER ON CONCRETE PITS
OR SEPTIC TANK RISERS
10-1457 FLOAT TREE
WITH 3 FLOATS SHOWN
TYPICAL FLOAT HANGER ON CONCRETE PITS
OR SEPTIC TANK RISERS
SK291
SK1218