Davey EcoMatic COMM500 Instalación E Instrucciones De Funcionamiento página 59

Cloradores salinos comerciales
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Once a suitable location is selected, drill a 32mm diameter hole in the pipe.
Once a suitable location is selected, drill a 32mm diameter hole in the pipe.
Once a suitable location is selected, drill a 32mm diameter hole in the pipe.
Place the O-ring in the groove on the inside face of the top half of the pipe clamp.
Place the O-ring in the groove on the inside face of the top half of the pipe clamp.
Coloque o O-ring na ranhura da face interior da metade superior da abraçadeira do tubo.
Place the O-ring in the groove on the inside face of the top half of the pipe clamp.
Place the top half of the pipe clamp onto the pipe ensuring that the hole in the pipe cla
the pipe.
O interruptor de caudal não deve ser montado na parte inferior dos tubos horizontais.
Place the top half of the pipe clamp onto the pipe ensuring that the hole in the pipe cla
Place the top half of the pipe clamp onto the pipe ensuring that the hole in the pipe cla
the pipe.
the pipe.
Posicione a metade inferior da abraçadeira no tubo e prenda com os fixadores fornecidos. Aperte o suficien-
te para impedir fugas.
59

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ecomatic comm1000Comm1000

Tabla de contenido