Mounting (4-Post Rack)
2
Secure the shelves
and cup washers
• For 2U equipment mounting, place four screws total in the front and four screws
total in the back.
• For 3U equipment mounting, place six screws total in the front and four screws
total in the back.
Tighten all screws before proceeding.
Warning: Do not attempt to install equipment until you have inserted
and tightened the required screws. The plastic pegs will not support
the weight of your equipment.
2U
2
3U
2
3
Using the included hardware, attach the mounting brackets to the forward mounting
holes of the cabinet. The mounting bracket "ears" should face forward. (Some
equipment may have pre-installed or integrated mounting brackets.)
2U
3
17-05-246-932487.indb 4
B
to the mounting rails permanently using the included screws
C
as shown.
B
C
B
C
3U
4
C
C
5/31/2017 4:32:28 PM