Kohler K-8855 Guia De Instalacion página 6

Ocultar thumbs Ver también para K-8855:
  • Guia (28 páginas)
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Aerator
4. Installation Checkout
Connect the drain tailpiece into the trap.
Ensure that all connections are tight.
Open the drain.
Turn on the main water supply and check for leaks.
Remove the faucet aerator.
Turn the faucet to the cold side and open the faucet. Run the
water for one minute to remove any debris. With the water
running, rotate the faucet to the hot side. Again run the water for
one minute.
Turn off the water.
Reinstall the faucet aerator.
1044533-2-A
6
Kohler Co.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-8855-4

Tabla de contenido