1-2. Ensure the base and wall are leveled. Place 2 metal tracks (B) approximately 25mm (1in) from the edge of
the wall panels to the center of the holes of the metal track.
3-4. Mark the holes clearly on the wall.
5. Remove tracks and drill pilot holes in the marked locations with a
6-7. Replace and secure the metal tracks (B) with screw (DD), fitting (GG) and cap (HH). Do not overtighten.
1
B
3
Helpful Hint
Make sure there
is a support stud
located behind the
drywall, behind the
tracks!
5
Φ 3mm
1/8in
WALL TRACKS INSTALLATION
3mm (1/8in) drill bit.
Φ
6
GG
HH
DD
Helpful Hint
Do not overtighten!
This may crack the
wall panels.
9
2
B
4
7
GG
HH
DD