Installation
Installation
Supplies Required:
• Pipe sealant
• Piping to ½" NPT water supply inlet on unit
• Sign-mounting hardware
NOTE: Local codes may require the installation of a backflow prevention valve to complete proper installation. Compliance
with local codes is the responsibility of the installer. Valve must be tested annually to verify that it is functioning properly.
Backflow prevention valves are not included with the fixture and may be supplied by the contractor or purchased from
Bradley Corporation.
Step 1: Attach eyewash
NOTE: The top of the eyewash heads should be positioned a maximum of 45" from the floor.
1. Select the desired location for the eyewash on the sink deck and drill a
2. Secure the assembled unit to the deck with the nut and washer provided as shown on page 4.
Step 2: Connect water supply
1. Connect the water supply using ¼" nominal (
washer and nut provided.
2. Mount the safety sign to wall or pipe using sign-mounting hardware supplied by installer.
3. Open the water supply lines. Test for leaks and adequate water flow.
Bradley Corporation • 215-634BL Rev. S; ECM 11-05-004
5
⁄
"
3
8
(137mm)
⁄
7
⁄
" O.D.) copper tubing (supplied by installer), the friction ring, seal
3
8
12"
(305mm)
Ø 2½"
(63mm)
2¾"
(70mm)
max. deck
thickness
5/16/11
" diameter hole.
8
8
⁄
"
3
8
(113mm)
36" (914mm)
to Finished Floor
S19-270BL
3