Descargar Imprimir esta página

Raychem MOD-3-HVT Serie Instructivo De Instalación página 4

Kit de modificación para terminales para cable trifásico con y sin pantalla

Publicidad

Idiomas disponibles

Idiomas disponibles

6. Trim rejacketing tubes.
Allow the tubes to cool enough to touch. Trim excess tubing from the end of
each phase.
7. Trim ground wire(s).
If cable has ground wire(s), trim to ground connection point--36" (915mm)
maximum.
If lug is to be installed, go to Step 8.
If no lug is to be installed on the end of the ground wire(s), solder block the
strands 3" (75mm) from the end of the wire to make a moisture block.
When solder is cool, wrap one turn of red sealant around the moisture block.
Go to Step 8.
8. Install tubing on ground wire.
Cut a 4" (100mm) piece of tubing from each of the small diameter ground
wire rejacketing tubings. Set aside for use as a lug seal.
Install a length of ground tubing over each ground wire. Shrink wire
jacketing tubing over the ground(s). Start at the cable jacket end and work
towards the end of the wire.
9. Install lug(s) on ground wire(s).
If no lug or ground wires are to be installed, go to Step 11.
If installing lugs on ground wires, cut back the ground rejacketing tube
to the length of the lug barrel +1/4" (5mm) .
Install the lug.
Wrap one layer of red sealant to overlap lug barrel and rejacketing tube.
PII-53163, Rev AE
DCR C27625
Installation Instructions
4
PCN 369999-000
Effective Date: November 20, 1995
652
Red
Sealant
3"
(75mm)
Solder Block on
Ground Wire(s)
594
Ground Wire
Tubing
595
Red
Sealant
Lug
654

Publicidad

loading

Este manual también es adecuado para:

Mod-3x-hvtMod-3y-hvtMod-3a-hvtMod-3b-hvt