Publicidad

Idiomas disponibles

Idiomas disponibles

Enlaces rápidos

Model No.:
Customer: Please record your model number. The model number
is found on the label located on the front panel of the box. It is
very important to record your model number. This information is
necessary when contacting us. If you have any questions on the
installation of this unit, please do not return to the store where
you purchased it. For additional help, call 1-800-355-ASB1, 8:00
am – 6:00 pm (ET) Monday – Thursday and 8:30 am – 3:30 pm
(ET) on Friday, or email us at customerservice@asbcorp.com.
1. Read these instructions and confirm that bathtub will fit in the
intended alcove and that the drain end is located where required
before beginning installation.
2. The alcove wall studs should be located as shown in Illustration 1
and be plumb. It is important that a stud is located as shown (*)
for attachment of the vertical flange on each side of the tub apron.
Other studs should be located according to local building codes.
• Rough plumbing must be installed before tub and/or wall
panels. Illustration 2 shows suggested location of fixtures
if new plumbing is being installed. Provide an access panel
on the back side of the wall with the plumbing fixtures. If
plumbing exists, check that fixtures will clear tub and panels.
All plumbing must meet local building codes.
• The bathtub must be installed on a solid and level sub-floor
15-3/8
14-5/8
Plumbing fixture side
16-3/4"
(right or left hand)
31"
Additional stud if
end of wall
Tub Apron
Illustration 1 Stud placement and drain location
P/N 27724 Rev.B 11/08
FIRENZE™ BATHTUB & WALL SET
REQUIREMENTS FOR A SUCCESSFUL INSTALLATION
14-5/8
15-3/8
14-1/2"
Drain cutout
8" x 10" Max.
Centered on drain
60"
Greenboard
INSTALLATION MANUAL
Important! These instructions include suggestions for rough
construction, drywall installation and plumbing installation that
we believe to be reliable. Local building codes vary by location
and could supersede those suggestions. If you are not confident in
your ability to perform these tasks, you should use a professional
installer or contract out those tasks you need help with.
that is square with the wall studs. The bathtub must sit directly
on a level sub-floor. If necessary, level floor with leveling
compound.
• Use the cutout from the bathtub carton to protect the bathtub
from damage during installation.
• The bathtub and wall set should not be installed in areas where
the temperature may drop below freezing (32ºF or 0ºC).
• Allow bathtub and wall set to reach room temperature for 30
minutes before installing.
Important: The alcove studs must be plumb and square to the
floor! Inside corners of the alcove should be square (refer to
Illustration 3).
8-11/32"
10"
12"
Backer
board
Stud
(right-hand installation shown)
Drain cutout
23"
8" x 10" Max.
Centered on drain
Illustration 2 Suggested rough plumbing locations
Shower head
elbow
Access
panel
location
81"
Mixing valve
Spout elbow
32"
1

Publicidad

Tabla de contenido
loading

Resumen de contenidos para American Shower & Bath FIRENZE

  • Página 1 INSTALLATION MANUAL FIRENZE™ BATHTUB & WALL SET Model No.: Important! These instructions include suggestions for rough Customer: Please record your model number. The model number construction, drywall installation and plumbing installation that is found on the label located on the front panel of the box. It is we believe to be reliable.
  • Página 2: Tools & Materials Required

    3. Special installations: • Above the floor drains Create a platform of 2 x 4’s (or taller depending on drain requirements) to raise the entire bathtub or shower base area and cover it with sub-flooring. This platform must be level and square to the wall studs. When installing plumbing, add platform height to the Each alcove dimensions shown in Illustration 2.
  • Página 3 Apply adhesive to the bottom support where it will touch the If you are installing one of our matching wall sets, proceed floor. The bathtub should now be set in the alcove plumb with the “Wall Set Installation” instructions that follow. If and square.
  • Página 4: Care And Cleaning

    Apply a bead of adhesive down each stud that will come in CARE AND CLEANING contact with the side panels. Also lay a caulk bead in the corner of side panels as shown in (Figure 4).Install each side panel by sliding panel firmly into corner. Press each For regular cleaning use only mild detergents or warm, soapy water panel firmly to ensure proper adhesion to studs.
  • Página 5: Juego De Bañera Y Paredes Firenze

    MANUAL DE INSTALACIÓN JUEGO DE BAÑERA Y PAREDES FIRENZE™ N° de Modelo: Viernes, o por correo electrónico a customerservice@asbcorp. com. ¡Importante! Estas instrucciones incluyen sugerencias Cliente: Anote su número de modelo. Lo puede encontrar en la para la construcción inicial, instalación de los paneles de etiqueta, ubicada en el panel frontal de la caja.
  • Página 6: Herramientas Y Materiales Necesarios

    3. Instalaciones especiales: • Acerca del desagüe del piso Haga una plataforma de 2 x 4’ (o más alta, dependiendo de los requisitos del desagüe) para elevar toda el área de la bañera y cubrirla con el sub-piso). Esta plataforma debe estar nivelada Cada una y a escuadra con las vigas de las paredes.
  • Página 7: Instalación De Juego De Pared

    La bañera debe estar apoyada en el hueco, aplomada y a Si está instalando uno de nuestros juegos de paredes, escuadra. Mientras se para en la bañera, fije la pestaña prosiga con las instrucciones de “Instalación de Juego de superior con clavos galvanizados para techo en cada viga Pared”...
  • Página 8: Cuidado Y Mantenimiento

    Coloque una capa de adhesivo en cada viga de la pared CUIDADO Y MANTENIMIENTO que entrará en contacto con los paneles laterales. También coloque una capa de adhesivo en el borde de los paneles laterales como se muestra en la Figura 4. Instale cada Para la limpieza normal, use únicamente detergentes suaves o agua panel lateral deslizándolo firmemente contra cada esquina.
  • Página 9: Ensemble Mural De Salle De Bain Firenze

    GUIDE D’INSTALLATION ENSEMBLE MURAL DE SALLE DE BAIN FIRENZE™ N° de modèle : vendredi. Vous pouvez aussi nous faire parvenir un courriel à Avis au client : Veuillez noter votre numéro de modèle. Le numéro customerservice@asbcorp.com. du modèle se trouve sur une étiquette située sur le panneau avant Important! Ces instructions incluent des suggestions que nous de l’appareil.
  • Página 10: Outils Et Matériaux Requis

    3. Installations spéciales : • Au-dessus des vidanges de plancher Créez une plateforme de 2” x 4” (ou plus, selon les besoins de la vidange) afin d’élever la zone de la baignoire en entier et couvrez-la de sous-plancher. Cette plateforme doit être d’aplomb et droite sur les poteaux du mur. Chaque Lorsque vous installez la plomberie, ajoutez la hauteur de la plateforme aux dimensions illustrées à...
  • Página 11 Si vous installez un ensemble mural correspondant, suivez Appliquer un adhésif sur le support du bas à l’endroit les instructions « Installation de l’ensemble mural » ci- qui touchera le plancher. La baignoire devrait maintenant dessous. Si vous installez de la céramique avec un autre reposer droit dans l’alcôve de plomberie.
  • Página 12: Entretien Et Nettoyage

    Appliquez un cordon de colle, vers le bas, le long de ENTRETIEN ET NETTOYAGE chaque poteau qui doit entrer en contact avec les panneaux latéraux. Étendre aussi un peu de calfeutrage dans le coin des panneaux de côté tel qu’illustré à la Figure 4. Posez Pour un nettoyage régulier, n’employez qu’un détergent doux ou de chaque panneau latéral en le glissant solidement dans le l’eau tiède savonneuse, appliquées à...

Tabla de contenido