Test Run The Whirlpool - Kohler K-1109 Guia De Instalacion

Bañera de hidromasaje
Ocultar thumbs Ver también para K-1109:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

8. Test Run the Whirlpool

Check all electrical connections, and make sure the electrical power to the whirlpool and heater (if
equipped) is on.
Make sure all union connections to the pump and heater are securely hand tightened.
Verify that the pump banding straps have been cut (if applicable), and that the pump is resting
directly on the subfloor or whirlpool base.
Fill the whirlpool to a level at least 2" (5.1 cm) above the top of the highest jet.
Operate the whirlpool for 5 minutes, and check all whirlpool piping connections for leaks.
For additional information on whirlpool operation, refer to "Confirm Proper Operation".
Kohler Co.
9
1012295-2-D

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-1151K-1357

Tabla de contenido