Preparation

RISK OF ELECTRIC SHOCK
 Always disconnect pump(s) from power source(s) before
handling or making any adjustments to either the pump(s),
the pump system, or the control panel.
Prepare Sump [Basin]
If replacing a previously installed pump, first prepare the basin by
removing the old pump and cleaning any debris from the basin.
Inspect all remaining equipment in the basin including guide rails,
piping, valves, and electrical junction boxes (if present) and repair
or replace as appropriate. Also, ensure that control hardware such
as floats or pressure transducers are clean, properly adjusted, and
in good working order.
3473000B
440–480V 3PH
575V 3PH
L1
BLK
BRN
RED
L1
L2
PNK
ORN
WHT
L2
L3
VIO
YEL
BLU
L3
L1
L2
SEAL LEAK
POWER
CORD
POTTING
RESIN
MOTOR
Copyright © Liberty Pumps, Inc. 2019 All rights reserved.
Pump Control and Alarm Floats
The water level in the basin is determined by the placement of the
BLK
control floats and should be positioned such that the pump is
completely submerged. The minimum water depth to properly
PNK
cool the motor should be set as follows:
XLE50
VIO
XLE70
L3
XLE100
XLE150
14" from the bottom of the legs
The upper water level should be positioned to minimize pump
starts. The alarm float should be above the turn on float switch but
below any inlets. No control should be set above the inlet to the
basin. Float switches must be unobstructed and maintain free
movement in basin.
Impeller Free Movement Check
Do not connect any power to pump until this check is complete.
Manually rotate the impeller to check that it spins freely with very
little resistance. The impeller can be rotated by reaching into the
pump intake. The pump can remain upright or can be laid down
on its side for easier access to the intake. Besides verification that
the impeller is freely spinning, rotating the impeller helps to
lubricate the shaft seals if the pump has been non-operational for
more than a week. It is recommended to rotate the impeller 5–10
full rotations.

Installation

 All installation and maintenance of pumps, controls,
protection devices, and general wiring shall be done by
qualified personnel.
 All electrical and safety practices shall be in accordance with
the National Electrical Code
Health Administration, or applicable local codes and
ordinances.
Electrical Connections
Complete pump and control wiring connections per wiring
diagrams included with the control panel and Figure 1/Figure 2 as
applicable. Check all wires for unintentional grounds after the
connections are made.
Thermostat and Seal Failure Connections
Verify thermostat wires are connected in series with the contactor
and that seal fail probes are properly connected and relay
sensitivity properly adjusted. Connections are provided on the
terminal strip inside the Liberty Pumps control panel.
Seal leak relay setup: The dial should be set to 75. For best
results, turn the dial until the light turns on (around 125), then
back slowly until the light just goes out (approx. 75).
7" from the bottom of the legs
7" from the bottom of the legs
9" from the bottom of the legs
RISK OF ELECTRIC SHOCK
®
, the Occupational Safety and
– 7 –