Descargar Imprimir esta página

nVent RAYCHEM JBM-100-A Instrucciones De Instalación página 6

Publicidad

Idiomas disponibles

Idiomas disponibles

6
• Mark the jacket
as shown.
8
• Fasten stand to pipe. Do
not pinch heating cables.
• Loop and tape extra
heating cable to pipe.
9
• Remove box nut.
O-ring
6 | nVent.com/RAYCHEM
5/8 in
(15 mm)
Note: For 1 in (25 mm) and
smaller pipes, use adapter
(purchased separately) and
install between stand and pipe.
Pipe strap
Glass cloth tape
• Install grommet
plugs in unused
openings.
7
JBM-SPA
adapter
for small
pipes
10
• Pull heating cable back
into stand as shown.
Use cable lubricant if
needed.
1 1/4 in
(32 mm)
• Repeat steps 2
through 7 for other
heating cables before
continuing to step 8.
Position
adapter
this side
up.
• Place junction box onto
stand. Align key ways
in large box hole with
alignment feature on stand.
• Put box nut back onto
stand.
• Tighten box nut with
spanner.
Torque = 22 +/- 2 Nm

Publicidad

loading

Este manual también es adecuado para:

Jbm-100-a6