Descargar Imprimir esta página

nVent RAYCHEM JBM-100-A Instrucciones De Instalación página 7

Publicidad

Idiomas disponibles

Idiomas disponibles

11
13
• Push core sealer onto the heating
cable to the mark made in step 6.
Note: Extra force
may be required
for larger cables
or at lower
temperatures.
bunch, or crossover.
15
• Trim bus wires and braid.
• Repeat steps 12 through
15 for all heating cables.
1/2 in
(13 mm)
• Slide strain relief
over heating
cables, down onto
box nut.
• Secure strain
relief by tightening
screws.
Optional: Knock
out drain hole
if installed on
bottom of pipe.
Make sure the bus
wires do not kink,
1/2 in
(13 mm)
12
CAUTION: Health Hazard.
Wash hands after contact with sealant. Consult
material safety data sheet VEN 0058.
AVERTISSEMENT: risque pour la santé. Se laver les
mains après tout contact avec le produit d'étanchéité.
Consulter la fiche de données de sécurité VEN 0058.
• If needed, re-twist and straighten bus
wires, then insert bus wires into guide
tubes as shown.
Make sure all strands
go into the tubes.
14
• Remove the guide tubes
and dispose of them in a
plastic bag.
• Slip the green/yellow
tube onto the braid. Heat-
shrinking is not required.
16
Finished view of installed
core sealers.
Tubes
nVent.com/RAYCHEM | 7

Publicidad

loading

Este manual también es adecuado para:

Jbm-100-a6